IDP - engineering · environment · architecture CASTELLANO CATALÀ ENGLISH PORTUGUÊS
RSSYoutubeTwitterLinkedinFacebook Blog
Transport infrastructure

Search for projects:


Category:  
Title:  
Content:  
Year:  




PROJECTS · TRANSPORT INFRASTRUCTURE

Salt and potash port terminal for TRAMER at the Barcelona harbor

2014-2016

Basic project and detail engineering of the new salt and potash port terminal for TRAMER at the Barcelona harbor located at the Alvarez de la Campa dock.

Characteristics:

Basic project and detail engineering of the new salt and potash port terminal for TRAMER at the Barcelona harbor located at the Alvarez de la Campa dock. The new terminal will have a surface of 8 hectares and a draught of 14 meters allowing loading ships up to 70.000 tons.

 

Complex projection of the TRAMER (Tráfico de Mercancías, S.A.) logistics terminal that englobes the necessary infrastructure for the salt and potash unloading, this salt and potash arrive from Suria by train and road (80 km) for its storage and loading of the ships.

 

Plot surface:

81.400 m2

Total build surface:

38.070 m2

Storage facility:

36.950 m2

Railroad terminal:

750 m2

Offices:

325 m2

Control offices:

64 m2

Stored materials:

Granular potash, Standard potash, Vacuum salt, Infrastructures salt.

 

 Project main unities:

 

  • Railroad unload terminal with 4 tracks with a simultaneously salt and potash reception capacity and a daily rotation up to 7 compositions. The tracks are ready for trains composed by 24 wagons.
    • UIC and metric track wide.
    • Trains composed by locomotives of the 254 series and wagons of the 62.000 series.
  •  Road unload terminal for trucks with a parking area for 32 trucks and potash and salt unloading pits. 
  • Handling logistics infrastructure to unload trains and trucks with potash and salt simultaneously and be storage o directly loaded on the ships. Belt infrastructure for two bridge shiploaders for the Panamax ships. 
  • Vacuum salt storage facility wioth a capacity of 130.000 Tn, allowing a 1.500 tn/h material extraction. 60 meters free interior section thanks to the combination of an exterior metallic structure and self-supporting covers.
  • Standard and granular potash storage with a capacity of 120.000 Tn, allowing a 1.500 tn/h material extraction. 50 meters interior free section. 
  • Salt collection surface with a capacity of 30.000 Tn. 
  • Offices, control rooms, workshops and maintaining and access control buildings.

 

Hired services:

  • Basic project
  • Detail engineering project



Salt and potash port terminal for TRAMER at the Barcelona harbor Salt and potash port terminal for TRAMER at the Barcelona harbor Salt and potash port terminal for TRAMER at the Barcelona harbor Salt and potash port terminal for TRAMER at the Barcelona harbor Salt and potash port terminal for TRAMER at the Barcelona harbor

<< Back

Related projects

Highway BR-262/MG Km 446.30 to km 476.20 (Brazil)

Highway BR-262/MG Km 446.30 to km 476.20 (Brazil)

Américo Vespucio Oriente Highway in Santiago de Chile (Chile)

Américo Vespucio Oriente Highway in Santiago de Chile (Chile)

Project works in 9 highway state highway (Brazil)

Project works in 9 highway state highway (Brazil)




COMPANY

AREAS OF ACTION


SERVICES


PROJECTS


COMMUNICATION

· News
· Media
· Twitter
· Linkedin
· Facebook
· Blog
· Newsletters
· Contact
IDP INGENIERIA Y ARQUITECTURA IBERIA SL · NIF. B62731807 · Site Map · Cookies Policy · Legal disclaimer · Web design Anunzia